Low initial cost due to:

  • the use of tapered built up structural members (Columns & Rafters);
  • the use of Z shaped secondary members (Purlin & Girt) that allows overlapping; 
  • Foundation is fewer and lighter.

Superior Product Quality:

  • Design Quality is consistent and is based on latest design in USA Codes.
  • Welding is done by professional welders.
  • Materials are ordered as per recognised standard.
  • Fabrication is done as per a Quality Plan.

Fast Project Construction:

  • Anchor Bolts are delivered earlier than the Building.
  • Buildings are fabricated and delivered within a short period due to standardisation.
  • Fast erection because all members are field bolted.

Functional Versatility:

  • Modular construction.
  • Large clear Spans (up to 100m).
  • Long Bay Spacing (up to 13m without Jack Beams).
  • Buildings are easily expandable on all sides (allowing for future expansion).

Architectural Flexibility:

  • Aesthetic features such as fascias, parapets and curved eaves greatly improve the appearance of the building.
  • Flashing and Trims are available in different shapes and colours. 
  • A wide range of wall and roof sheeting.
  • Readily available interface details between steel and other materials (glazing, block wall, curtain wall, etc.).

Low Maintenance and Operating Costs:

  • Virtually no maintenance required for all panels. 
  • Roof requires only periodic cleaning.
  • Annual washing of Eave Gutters.
  • Watertight roofs.
  • Energy efficient roof and wall systems through usage of insulation.

PEB versus Conventional Steel Buildings

  Pre-Engineered Buildings (PEB) Conventional Steel Buildings
Design Quick and efficient; since PEBs are mainly formed of standard sections and connections, design time is significantly reduced. Basic designs are used over. Slow: Each conventional steel structure is designed from scratch by the Consultant, with fewer design aids available to the Engineer.
Delivery Average 6 to 8 weeks. Average 20 to 26 weeks.
Foundations Simple design, easy to construct and light weight. Extensive, heavy foundations required.
Erection Cost & Time Both costs & time of erection are minimized Typically, they are 20% more expensive than PEB. In most of the cases, the erection costs and time are not estimated accurately.
The erection process is easy, fast, step by step and with hardly any requirement for equipments. Erection is slow and extensive field labor is required. Heavy equipment is often needed.
Architecture Outstanding architectural design can be achieved at low cost using standard architectural features and interface details. Special architectural design and features must be developed for each project, which often require research and thus resulting in much higher costs.
Future Expansion PEB Building is designed with future expansion in mind. It is simple, easy and cost effective. One supplier can co-ordinate changes. Future expansion would be more difficult and, more likely, costlier.
Responsibility Single responsibility for design, supply and even erection of PEBs. Multiple responsibilities can result in questions of who is responsible when components do not fit properly

What’s New

Media
  • January-2014
          Jindal Buildsys Bags Chimique India Ltd project, Hissar (Haryana)

         Jindal Buildsys Bags N.K Construction project, Ambala (Haryana)

  • December-2013
          Jindal Buildsys Bags Minda Projects Ltd project, Manesar (Haryana)

  • November-2013
          Jindal Buildsys Bags Huda City Centre Food Court project, Gurgaon (Haryana)

  • October-2013
          Jindal Buildsys Bags DMRC CC-52, project, (Delhi)

         Jindal Buildsys Bags DMRC CC-45 project, (Delhi)

         Jindal Buildsys Bags DMRC CC-54 project, (Delhi)

         Jindal Buildsys Bags MRMC Foods Ltd project, Firozpur(Punjab)

  • September-2013
          Jindal Buildsys Bags Firozpur Foods Ltd project, Firozpur (Punjab)

         Jindal Buildsys Bags Crown Rice project, Amritsar (Punjab)

         Jindal Buildsys Bags Roki Minda Pvt.Ltd project, Bawal (Haryana)

         Jindal Buildsys Bags Universal Industrial Mfg Plants Ltd project, Bhiwadi (Rajasthan)

  • August-2013
          Jindal Buildsys Bags AFS Hanger project, Tezpur (Assam)

         Jindal Buildsys Bags Shree Nangal Rice Mill project, Gurdaspur (Punjab)

         Jindal Buildsys Bags Incotech Ltd project, Bawal (Haryana)

         Jindal Buildsys Bags Shakti Coatings project, Ahmadgarh (Punjab)

         Jindal Buildsys Bags JBM Autosystem Ltd project, Pathredi (Rajasthan)

  • June-2013
          Jindal Buildsys Bags Stylam Industries Ltd project, Panchkula (Haryana)

         Jindal Buildsys Bags DD International project, Karnal (Haryana)

         Jindal Buildsys Bags Haryana Liquors Pvt. Ltd project, Chandigarh

         Jindal Buildsys Bags Roots Warehousing Solutions project, Gurgaon (Haryana)

  • May-2013
          Jindal Buildsys Bags Sandhar Technologies Ltd project, Bawal (Haryana)

         Jindal Buildsys Bags JNB Steel project, Hissar (Haryana


  • April-2013
          Jindal Buildsys Bags-Prem Industries project. Karnal (Haryana)

         Jindal Buildsys Bags-Sandhar Technologies Ltd. Project. Bawal (Haryana)

         Jindal Buildsys Bags-Expotec International Ltd.Project-Ghana & Ivory Cost

  • March-2013
          Jindal Buildsys Bags-Rahul Pam Pvt Ltd.Project Karnal (Haryana)

          Jindal Buildsys Bags-JBM Auto Limited. Project Pathredi (Haryana)

          Jindal Buildsys Bags-Longo walia Yarns Limited.Project Ludhiana (Punjab)

          Jindal Buildsys Bags-Aromatrix Flora Pvt Ltd. Project Solan (HP)

  • February-2013
         Jindal Buildsys Bags-DMRC-J.Kumar Infraprojects Ltd. Project Delhi

         Jindal Buildsys Bags-The Indure Pvt Ltd. Project Orrisa

         Jindal Buildsys Bags-Uttam Galva, Project Bawal (Haryana)

         Jindal Buildsys Bags-AB Refer Warehousing, Project Baddi (H.P.)

         Jindal Buildsys Bags-Rapid Metro IL & FS Rail Limited. Project Gurgaon (Haryana)

  • January-2013
          Jindal Buildsys Bags-SNB Enterprises Project. Nathupur  (Haryana)

          Jindal Buildsys Bags-JCB Pipes, Project. Hisar  (Haryana) 

          Jindal Buildsys Bags-Maharaja Agarsen College Project.  Delhi

          Jindal Buildsys Bags-Arjan Infocom, Project. Kundli  (Sonipat)

          Jindal Buildsys Bags-Warehouse at Dharuhera

          Jindal Buildsys Bags-Satluj Spintex Project.  Mansa

          Jindal Buildsys Bags-Shakti Industries Project Ahmadgarh (Punjab)

  • December-2012
          Jindal Buildsys Bags-Luminous Mobile Project Gagrate, (H.P)

Know More...

Downloads

Corporate Brochure Corporate Brochure

Corporate Persentation Corporate Persentation

Case Studies Case Studies